|
Design capacity: | 18.000 HV |
Dry weather flow: |
4.320 m³/d |
|
biological preparation with SBR process Sludge dehydration |
Type of Advertisment: |
Product mix |
Production costs: |
7.666.120,- € |
Construction period: |
2005 - 2007 |
Size of order elementis consult: |
Part VII HOAI: engineering work
Part IX HOAI: technichal equipment
Part II HOAI: Open Space Planning
|
Amount of work elementis consult: |
Part VII HOAI: engineering work |
Order sum elementis consult: |
330.000,- € |
Processing period: |
1991 – 2011 |