|
Design capacity: |
|
||||
Dry weather flow: |
9.120 m³/d | ||||
|
upstreamed - denitrification |
||||
Type of Advertisment: |
|
||||
Total production costs: |
ca. 10.200.000,- € |
||||
Construction period: |
|
||||
Size of order elementis consult: |
Immediate measure:
Total renovation:
|
||||
Order sum elementis consult: |
|
||||
Processing period: |
|